Acts of Sustainability Engineering Programming: Electrical, Electronic, and Telecommunication Systems : See schedule
call list to Authors for Sustaining Working Draft Grade. Mr
Authors, please inform your respective Jury on the planning of acts of support.
Location: Meeting Room of the Department or the Laboratory EEST CICOM.
are reminded that the authors should contact their respective Jury of the date, time and place to be held on Lift Act. Must be at least 15 min. before time scheduled, with the file folder containing: 1 .-
Peace and academic unless issued by the respective Program Director (not the same as APTG)
2 .- Authorization Act signed to Sustain by the Jury and Director
3 .- Two (2) Volumes of the thesis bound.
4 .- Two (2) CD's with work in electronic format
5 .- presustentación Act signed by the Jury and Director. 6 .-
formal suit.
formats used by the Jury in the Act of Sustainability:
1. format for the Director or Opponent
2. Rating Sustainability Act Working
Grade 3. Graduate Registration Form
Remember append to a folder on to enter 2 CD's.
0 comments:
Post a Comment